|
OREN2002 | Sawmilling Tecnology | 2+1+0 | ECTS:3 | Year / Semester | Spring Semester | Level of Course | First Cycle | Status | Compulsory | Department | DEPARTMENT of FOREST INDUSTRY ENGINEERING | Prerequisites and co-requisites | None | Mode of Delivery | Face to face, Lab work , Practical | Contact Hours | 14 weeks - 2 hours of lectures and 1 hour of practicals per week | Lecturer | Doç. Dr. Aydın DEMİR | Co-Lecturer | None | Language of instruction | Turkish | Professional practise ( internship ) | None | | The aim of the course: | Teaching of lumber production with the maximum yield and minimum loss. Giving information on the lumber manufacturing methods, standardization and new approaches developed for sawmilling industry. |
Learning Outcomes | CTPO | TOA | Upon successful completion of the course, the students will be able to : | | | LO - 1 : | the technical development of lumber manufacturin | 2 | 1 | LO - 2 : | describe standards for raw materials | 2,3,4 | 1 | LO - 3 : | apply various techniques in sawing methods | 1,6 | 1 | LO - 4 : | evaluate productivity in lumber manufacturing and factors effective on the productivit | 5,8 | 1 | LO - 5 : | see sawing machines using for the lumber industry | 4 | 1 | LO - 6 : | see maintenance and repair of sawing machines and tolls | 1,2 | 1 | CTPO : Contribution to programme outcomes, TOA :Type of assessment (1: written exam, 2: Oral exam, 3: Homework assignment, 4: Laboratory exercise/exam, 5: Seminar / presentation, 6: Term paper), LO : Learning Outcome | |
Technical development of lumber manufacturing. Standards for raw materials. Types of lumber and measurement. Residues of lumber production and related standards. Sawing methods. Productivity in lumber manufacturing and factors effective on the productivity. Quality yield. Debarking. Sawing with different methods. Sawing machines using fort he lumber industry. Transport equipments. Machines for lifting. Measurement errors for lumber and their correction. Job flow in the sawmills using frame saw machine and band saw. Maintenance and repair of sawing machines and tolls. |
|
1 | Çolakoğlu, G., Kereste Endüstri Ders Notları (Basılmamış) . | | |
1 | Fronius.K., 1989.Arbeiten und Anlagen im Sagewerk, Band 1. band 2, DRW. Verlag. Berlin. | | 2 | Williston, M. , 1976. Lumber Manufacturing: The Design and Operation of Sawmills and Planer Mills, Miller Freeman Publications, Newyork. | | |
Method of Assessment | Type of assessment | Week No | Date | Duration (hours) | Weight (%) | Mid-term exam | 9 | | 1 | 50 | End-of-term exam | 16 | | 1 | 50 | |
Student Work Load and its Distribution | Type of work | Duration (hours pw) | No of weeks / Number of activity | Hours in total per term | Yüz yüze eğitim | 3 | 14 | 42 | Sınıf dışı çalışma | 4 | 14 | 56 | Laboratuar çalışması | 1 | 14 | 14 | Arasınav için hazırlık | 3 | 7 | 21 | Arasınav | 1 | 1 | 1 | Kısa sınav | 1 | 1 | 1 | Dönem sonu sınavı için hazırlık | 3 | 4 | 12 | Dönem sonu sınavı | 1 | 1 | 1 | Total work load | | | 148 |
|