INS4061 | Computer Aided Approximate Cost Analysis | 3+0+0 | ECTS:6 | Year / Semester | Fall Semester | Level of Course | First Cycle | Status | Elective | Department | DEPARTMENT of CIVIL ENGINEERING | Prerequisites and co-requisites | None | Mode of Delivery | Face to face | Contact Hours | 14 weeks - 3 hours of lectures per week | Lecturer | Doç. Dr. Hasan Basri BAŞAĞA | Co-Lecturer | Asst. Prof. Dr. Hasan Basri BASAGA | Language of instruction | Turkish | Professional practise ( internship ) | None | | The aim of the course: | To give students information about the approximate cost and quantity survey and to provide students the ability to prepare the quantity survey, approximate cost with computer program. |
Learning Outcomes | CTPO | TOA | Upon successful completion of the course, the students will be able to : | | | LO - 1 : | Get knowledge general information about quantity survey and the approximate cost. | 6,10 | 1 | LO - 2 : | prepare quantity survey of a structure by using a computer program.
| 6,10 | 1 | LO - 3 : | prepare the approximate cost of a structure by using a computer program. | 6,10 | 1 | CTPO : Contribution to programme outcomes, TOA :Type of assessment (1: written exam, 2: Oral exam, 3: Homework assignment, 4: Laboratory exercise/exam, 5: Seminar / presentation, 6: Term paper), LO : Learning Outcome | |
Introduction, General Information About The Approximate Cost, File Management and Updates. Job Classes, Site Lists, Quantity Survey of a structure with the e-Hakediş Computer Program, Special Cost Analysis with e-Hakediş Computer Program, Approximate Cost Documents with e-Hakediş Computer Program, Application: Quantity Survey and Approximate Cost Analysis of Different Structure Projects with e-Hakediş Program |
|
Course Syllabus | Week | Subject | Related Notes / Files | Week 1 | Introduction | | Week 2 | General Information About The Approximate Cost | | Week 3 | File Management and Updates. Job Classes | | Week 4 | Site Lists | | Week 5 | Quantity Survey of a structure with a Computer Program | | Week 6 | Quantity Survey of a structure with a Computer Program | | Week 7 | Special Cost Analysis with a Computer Program | | Week 8 | Approximate Cost Documents with a Computer Program | | Week 9 | Mid-term exam | | Week 10 | Application: Quantity Survey and Approximate Cost Analysis of Different Structure Projects with a Computer Program | | Week 11 | Application: Quantity Survey and Approximate Cost Analysis of Different Structure Projects with a Computer Program | | Week 12 | Application: Quantity Survey and Approximate Cost Analysis of Different Structure Projects with a Computer Program | | Week 13 | Application: Quantity Survey and Approximate Cost Analysis of Different Structure Projects with a Computer Program | | Week 14 | Application: Quantity Survey and Approximate Cost Analysis of Different Structure Projects with a Computer Program | | Week 15 | Application: Quantity Survey and Approximate Cost Analysis of Different Structure Projects with a Computer Program | | Week 16 | End-of-term exam | | |
1 | E-HakedişNet, 4734 Sayılı Kanına Uygun Olarak, Yaklaşık Maliyet, Hakediş ve Kesin Hesap Düzenleme Programı (e-Hakediş), Oska Bilgisayar Sistemleri, Yazılım, Donanım Sanayi ve Ticaret Ltd. Şti., 2014. | | |
1 | Gözü, Şakir Uğur, İnşaat Metraj ve Keşif İşlemi, Beta Basım Yayım Dağıtım A.Ş., 2014. | | 2 | Öcal, M. Emin, Yapı İşletmesi ve Maloluş Hesapları, Birsen Yayınevi Ltd. Şti., 2009. | | 3 | Akbıyıklı, Rıfat, İnşaat Yönetimi Metraj ve Maliyet Hesapları, Birsen Yayınevi Ltd. Şti., 2012. | | 4 | Sunguroğlu, Kerim; Murat, İbrahim, Yapı İşletmesi Şantiye Tekniği Maliyet Hesapları, Bilim Kitap Kırtasiye Ltd. Şti., 2013. | | |
Method of Assessment | Type of assessment | Week No | Date | Duration (hours) | Weight (%) | Mid-term exam | 9 | | 2 | 50 | End-of-term exam | 16 | | 2 | 50 | |
Student Work Load and its Distribution | Type of work | Duration (hours pw) | No of weeks / Number of activity | Hours in total per term | Yüz yüze eğitim | 2 | 14 | 28 | Arasınav | 1 | 2 | 2 | Dönem sonu sınavı | 1 | 2 | 2 | Total work load | | | 32 |
|