| MDM4023 | Mining Applications | 2+2+0 | ECTS:4 | | Year / Semester | Fall Semester | | Level of Course | First Cycle | | Status | Elective | | Department | DEPARTMENT of MINING ENGINEERING | | Prerequisites and co-requisites | None | | Mode of Delivery | Face to face, Practical | | Contact Hours | 14 weeks - 2 hours of lectures and 2 hours of practicals per week | | Lecturer | -- | | Co-Lecturer | Members of department's Prof., Assoc. Prof. Dr., Assist. Prof. Dr. and Lecturer | | Language of instruction | Turkish | | Professional practise ( internship ) | None | | | | The aim of the course: | | The objective of this course is to visit different mine sites for every week, to increase their practical knowledge and to apply basic mining engineering principles to practical mining applications. |
| Learning Outcomes | CTPO | TOA | | Upon successful completion of the course, the students will be able to : | | | | LO - 1 : | explain several mining techniques, and understand how each technique works. | 1.3 - 4.2 - 6.3 | 1,3 | | LO - 2 : | know how to develope benches and to design rock blast round in surface mining. | 1.3 - 4.2 - 6.3 | 1,3 | | LO - 3 : | know how to develope mine openings and roof support and vantilation in underground mining. | 1.3 - 4.2 - 6.3 | 1,3 | | LO - 4 : | understand separation methods and mineral processing applications and flowsheet developed from plants and how to evaluate and use the results. | 1.3 - 4.2 - 6.3 | 1,3 | | LO - 5 : | be introduced to new issues and novel techniques in mining operations. | 1.3 - 4.2 - 6.3 | 1,3 | | CTPO : Contribution to programme outcomes, TOA :Type of assessment (1: written exam, 2: Oral exam, 3: Homework assignment, 4: Laboratory exercise/exam, 5: Seminar / presentation, 6: Term paper), LO : Learning Outcome | | |
| Çayeli underground copper mine and flotation plant, Gümüşhane Koza underground gold and processing plant, Murgul surface mine and flotation plant, Lahanos underground copper and zinc mine and flotation plant, Şebinkarahisar underground Lead and Zinc mine and flotation plant, Amasya underground coal mine and comminution, screening and classification plant, Aşkale Cement Plant, Ordu Ceramic Plant, Drilling and soil test at MTA, and so on. |
| |
| Course Syllabus | | Week | Subject | Related Notes / Files | | Week 1 | General knowledge about mine sites to be visited | | | Week 2 | Murgul surface copper mine and flotation plant | | | Week 3 | Çayeli underground copper and zinc mine and processing plant | | | Week 4 | Gümüşhane Koza underground gold mine and processing plant | | | Week 5 | Lahanos underground copper and zinc mine and flotation plant | | | Week 6 | Şebinkarahisar underground lead and zinc mine and flotation plant | | | Week 7 | Amasya underground coal mine and comminution, screening and classification plant | | | Week 8 | Mid-term exam | | | Week 9 | Ordu ceramic plant | | | Week 10 | Drilling and soil test at MTA | | | Week 11 | Aşkale cement plant | | | Week 12 | Marble plant | | | Week 13 | Quarry production | | | Week 14 | Tunnel construction | | | Week 15 | Trabzon cement plant | | | Week 16 | End-of-term exam | | | |
| 1 | Hoek, E. and E. T. Brown, (1980), Underground Excavations in Rock | | | |
| 1 | Hoek, E., (2000), Rock Engineering Handbook | | | 2 | Persson, P.A., Holmberg, R, Lee, J. 1994, Rock Blasting and Explosive Engineering, CRC Pres LLC, 535 p | | | 3 | Wills, B.A., 1992. Mineral Processing Technology, 5th edition, Pergamon Press | | | |
| Method of Assessment | | Type of assessment | Week No | Date | Duration (hours) | Weight (%) | | Mid-term exam | 8 | | | 50 | | End-of-term exam | 16 | | | 50 | | |
| Student Work Load and its Distribution | | Type of work | Duration (hours pw) | No of weeks / Number of activity | Hours in total per term | | Yüz yüze eğitim | 3 | 14 | 42 | | Uygulama | 3 | 14 | 42 | | Dönem sonu sınavı için hazırlık | 15 | 1 | 15 | | Dönem sonu sınavı | 1.5 | 1 | 1.5 | | Total work load | | | 100.5 |
|